-->
La Gare d'Ascq
Saturday, September 28, 2019
Track-bed is done!
All track-beds have been positioned and glued down:
The next steps are to solder all the wires to the tracks and switches, make holes in the platform for all the wires and the moving points of the switches, then glue the tracks!
Newer Post
Older Post
Home