This is the last part of wiring before closing the rack! This is for shelf #1 with the 4 Lenz LS150 that commands the switch motors.
Not much to mention here; it's the same process as before.
-->
This is the last part of wiring before closing the rack! This is for shelf #1 with the 4 Lenz LS150 that commands the switch motors.
Not much to mention here; it's the same process as before.
In this section, I focus on the connections between shelf #2 in the rack and the layout. I have spent a fair amount of time finding connectors that can carry the 5 Amp from the command station to the layout. I chose the MX150 connectors from Molex.